Wednesday 22 January 2014

Just Starting

I have never done this before, but I thought I would start this blog up to document the work that was being done as the Carlyle Memorial Hall undergoes renovation.  I hope you enjoy the history of this.

2014-01-08
This is not a great photo, but you can see the concrete wall at the front of the bar, and the original hardwood floor.  

2014-01-08
This photo shows the hardwood floor with slots in the floor to relieve the pressure when the hardwood slats swell due to moisture.  

2014-01-08

Most of the concrete wall in front of the bar has now been removed.  

More Photos and dates will be posted tomorrow.  

No comments:

Post a Comment