Then we set up to install the flooring. That included cleaning and removing most of the clutter that had accumulated on the floor.
2014-01-31
By the end of the day we had installed a test section on the floor. Very careful work to not get glue all over the place, but we have started. Tomorrow, Feb 1 will be a big day trying to install as much as possible.
The bar has had laminates and finishing installed, but I have not been at the shop for a while to take photos. I will try to squeeze some time in tomorrow to take photos of the bar as it progresses.
Tomorrow will be a big day!!